QUALITY INSPECTION OF PHUC THUAN LEATHER SHOE FACTORY AND AUXILIARY STRUCTURES

12/8/2026 | 11 views

In order to comprehensively assess the current structural safety and operational quality of the factory building, Phuc Thuan Co., Ltd. entrusted Sao Viet Construction Design Consulting and Inspection Joint stock Company (SVG Engineering) with the inspection of the leather shoe manufacturing factory project and its auxiliary structures. The inspection was carried out directly at the project site in Tien Lang District, Hai Phong City, Vietnam, in 2026, in the context of stringent technical standards required to ensure safe and efficient manufacturing operations. With its professional expertise and systematic factory inspection procedures, SVG Engineering is committed to providing objective and accurate assessments, enabling the Investor to proactively optimize maintenance solutions and ensure the highest level of safety throughout the long-term operation of the facility.

QUALITY INSPECTION OF PHUC THUAN LEATHER SHOE FACTORY AND AUXILIARY STRUCTURES

  • Leather Shoe Manufacturing Factory and Auxiliary Structures

  •  Address: Tien Lang District, Hai Phong City, Viet Nam

  • Investor: Phuc Thuan Co., Ltd.

  • Inspection Unit: Sao Viet Construction Design Consulting and Inspection Joint stock Company (SVG Engineering)

  •  Year of implementation: 2026

CONTENTS OF QUALITY INSPECTION OF PHUC THUAN LEATHER SHOE FACTORY AND AUXILIARY STRUCTURES

1. Technical standards and Construction codes applied to the Factory building inspection

No Mã hiệu/ Codes Tên tiêu chuẩn/ Applied Standard
1 TCVN 2737: 2023 Loads and actions – Design standards.
2 TCVN 5574:2018 Concrete and reinforced concrete structures – Design standard.
3 TCVN 5575:2012 Steel structures – Design standard.
4 TCVN 4453:1995 Monolithic concrete and reinforced concrete structures – Code of practice for construction and acceptance.
5 TCVN 14524:2025 Concrete – Testing and assessment of strength in monolithic structures and precast products
6 TCVN 9334:2012 Heavyweight concrete – Method for determination of compressive strength using a rebound hammer.
7 TCVN 9335:2012 Heavyweight concrete – Non-destructive testing methods – Determination of compressive strength using a combination of ultrasonic pulse velocity and rebound hammer
8 TCVN 9356:2012 Reinforced concrete structures – Electromagnetic method for determining concrete cover thickness, and the location and diameter of reinforcement.
9 TCVN 9357:2012 Heavyweight concrete – Assessment of concrete quality – Method for determination of ultrasonic pulse velocity.
10 TCVN 9381:2012 Guidelines for assessing the hazard level and the results of construction quality inspection
11 ... Relevant current regulations.

 

2. Description of the Factory building subject to Inspection

  • Project: Leather Shoe Manufacturing Factories No. 3 and 4

  • Design Year: 2014

  • Year of Commissioning: 2015

  • Inspection Scope: Factory No. 3 (+ 1 mezzanine floor): 80 m × 28 m; Factory No. 4: 48.2 m × 10.2 m.

3. Purpose of Factory Inspection

The purpose of the survey is to conduct measurements, inspections, and a reassessment following the Factory Inspection Report dated January 16, 2025, previously prepared by our Company for the entire factory complex of Phuc Thuan Co., Ltd. The analysis and assessment are carried out to determine the level of structural safety and potential hazards of the facility, including the following activities:

No Factory Inspection Items Factory Inspection Scope and Contents
I Load-Bearing Structure  
1 Foundation Inspection of Differential Settlement Between Floor and Foundation
2 Columns Inspection of Inclination (Lateral Displacement)
3 Roof Trusses Deflection Inspection
4 Purlins Deflection Inspection
5 Roofing Sheets Inspection of Thickness, Deflection, and Oxidation
II Building Enclosure Structure​  
1 Wall Inspection of Longitudinal, Transverse, and Diagonal Cracks
2 Steel Frame, Wall Cladding Sheets Integrity Inspection

 

4. Factory Inspection Results

a. Factory Foundations and Floor Slab:
No significant changes were observed compared with the Factory Inspection Report dated January 16, 2025.

b. Steel Columns:
No significant changes were observed compared with the Factory Inspection Report dated January 16, 2025.

c. Metal Roofing, Steel Roof Trusses, and Roof Purlins:
No significant changes were observed compared with the Factory Inspection Report dated January 16, 2025.

d. Building Enclosure Structure:
At some locations, the external enclosure walls have developed additional inclination and settlement. A repair plan should be developed, or the affected enclosure structures should be replaced with lightweight enclosure systems.

IMAGES OF QUALITY INSPECTION OF PHUC THUAN LEATHER SHOE FACTORY AND AUXILIARY STRUCTURES

COST OF CONSTRUCTION INSPECTION FOR FACTORY IN VIETNAM

Please immediately contact Hotline: 0902.593.686 (Mr. Thang) & Email: svg.engineer@gmail.com for support and advice on issues related to Construction Inspection for factory in Viet Nam ... Best regards! 


VietNam construction consulting - Mr. Thang 0902.593.686

CONTACT US:

SAO VIET CONSTRUCTION DESIGN CONSULTING AND INSPECTION JOINT STOCK COMPANY

🏢 Hai Phong Office :

Address : 7th floor SVG Building - Bui Vien Street - An Bien Ward - Hai Phong City
☎ Tel: (0225) 3.747.819
📞 Hotline: 0902.593.686
📧 Email: svg.engineer@gmail.com

🌎 VietNam Website: giamsatcongtrinh.com 
🌎 English Website: en.giamsatcongtrinh.com
🌎 China Website: cn.giamsatcongtrinh.com

 Youtube Channel: https://www.youtube.com/@svgengineering

🏢 Representative offices:

  • Ha Noi  Branch Office : No. 9/ 81 Hoang Cau Street, Dong Da Ward, Hanoi Capital
  • Ho Chi Minh Branch Office: 2/1C Cao Thang Street, Ban Co Ward, Ho Chi Minh City
  • Hue Branch Office : M25 Lot , 21 Street, Dong Nam Thuy An, Thanh Thuy Ward, Hue City