Ensuring that warehouses are safely inspected and compliant with required standards is always essential. Currently, the quality inspection of Dinh Vang Warehouse is carried out by SVG Engineering – Sao Viet Construction Design Consulting and Inspection Joint Stock Company, a construction inspection firm with 20 years of experience. SVG Engineering conducts thorough inspections to ensure that Dinh Vang Warehouse has a sound structural system and meets all necessary conditions to continue safe and efficient production operations.
QUALITY INSPECTION OF DINH VANG WAREHOUSE IN HAI PHONG CITY, VIETNAM
- Investor: Dinh Vang Co., Ltd.
- Address: Pham Van Dong Street - Duong Kinh Ward - Hai Phong City - Viet Nam
- Mission: Construction Quality inspection of Warehouse
- Inspection Unit: Sao Viet Construction Design Consulting and Inspection Joint stock Company (SVG Engineering)
- Year of implementation: 2025
CONTENTS OF QUALITY INSPECTION OF DINH VANG WAREHOUSE IN HAI PHONG CITY, VIETNAM
1. Survey of the Existing Condition of the Warehouse Buildings
a) Warehouse No. 1:
Total floor area: 566.5 m².
b) Warehouse No. 2:
Total floor area: 66 m².
2. Purpose of the Warehouse Survey and Structural Inspection
The purpose of the survey and inspection work is to record defects, damages, and deviations occurring in structural members, to measure the actual geometric parameters of the building structures and their components, and to determine the conformity or nonconformity of these parameters with applicable requirements.
The results are analyzed and evaluated to determine the level of structural safety and potential risk of the warehouse buildings.
The scope of the warehouse inspection includes:
|
No.
|
Inspection Items
|
Inspection Details
|
|
1
|
Load-bearing Structure
|
|
|
1.1
|
Foundation |
Check for settlement between the foundation and the ground.
|
|
1.2
|
Column
|
Check the tilt
|
|
1.3
|
Truss
|
Check deflection
|
|
1.4
|
Purlin
|
Check deflection
|
|
1.5
|
Roofing
|
Check for thickness, deflection, and oxidation.
|
|
2
|
Covering Structure
|
|
|
2.1
|
Steel frame, corrugated iron cladding.
|
Integrity check
|
3. Results of the Warehouse Structural Inspection
a) Warehouse No. 1 – Zone 1:
-
Factory floor:
Satisfactory, as no significant settlement or deflection has been observed.
-
Steel columns:
Satisfactory, as the deviation between the column top and base is within the allowable tolerance of 10 mm.
-
Roof sheeting, steel trusses, and roof purlins:
The steel trusses are satisfactory after stability assessment through roof deflection measurements using a leveling instrument; the purlins are satisfactory after stability assessment through deflection measurements using a laser measuring device.
b) Warehouse No. 1 – Zone 2: (the content corresponds to your “Nhà kho số 1 – Khu 2”; if you want numbering adjusted, I can standardize it)
-
Factory floor:
Satisfactory, as no significant settlement or deflection has been observed.
-
Steel columns:
Unsatisfactory, as the deviation between the column top and base exceeds the allowable tolerance of 10 mm.
-
Roof sheeting, steel trusses, and roof purlins:
The roof is covered with color-coated galvanized steel sheets.
The steel trusses are satisfactory after stability assessment through roof deflection measurements using a leveling instrument.
The roof purlins show corrosion, which has spread to the roof sheeting due to long-term environmental exposure.
➔ This warehouse requires maintenance and repair, including treatment of corroded areas and structural strengthening of severely inclined columns.
c) Warehouse No. 2:
-
Factory floor:
The existing internal factory roadway is utilized.
-
Steel reinforcement / steel columns:
Satisfactory, as the deviation between the column top and base is within the allowable tolerance of 10 mm.
-
Roof sheeting, steel trusses, and roof purlins:
The roof is covered with color-coated metal sheets with enclosure panels.
The steel trusses are satisfactory after stability assessment through roof deflection measurements using a leveling instrument.
The purlins are satisfactory after stability assessment through roof deflection measurements using a laser distance measuring device.
d) Conclusion:
- The warehouse buildings are safe for normal use and require only minor repairs. Periodic inspection and monitoring are recommended.
IMAGES OF QUALITY INSPECTION OF DINH VANG WAREHOUSE IN HAI PHONG CITY, VIETNAM










COST OF CONSTRUCTION INSPECTION IN VIETNAM
Please immediately contact Hotline: 0902.593.686 (Mr. Thang) & Email: svg.engineer@gmail.com for support and advice on issues related to Construction Inspection in Viet Nam ... Best regards!

VietNam construction consulting - Mr. Thang 0902.593.686
CONTACT US:
SAO VIET CONSTRUCTION DESIGN CONSULTING AND INSPECTION JOINT STOCK COMPANY
🏢 Hai Phong Office :
Address : 7th floor SVG Building - Bui Vien Street - An Bien Ward - Hai Phong City
☎ Tel: (0225) 3.747.819
📞 Hotline: 0902.593.686
📧 Email: svg.engineer@gmail.com
🌎 VietNam Website: giamsatcongtrinh.com
🌎 English Website: en.giamsatcongtrinh.com
🌎 China Website: cn.giamsatcongtrinh.com
Youtube Channel: https://www.youtube.com/@svgengineering
🏢 Representative offices:
- Ha Noi Branch Office : No. 9/ 81 Hoang Cau Street, Dong Da Ward, Hanoi Capital
- Ho Chi Minh Branch Office: 2/1C Cao Thang Street, Ban Co Ward, Ho Chi Minh City
- Hue Branch Office : M25 Lot , 21 Street, Dong Nam Thuy An, Thanh Thuy Ward, Hue City