In coastal and riverside construction projects, the appraisal of construction documentation plays a particularly important role. Unlike conventional construction works on land, shoreline protection structures and coastal technical infrastructure are directly exposed to tidal fluctuations, waves, currents, geological conditions, and the natural environment. Therefore, reviewing and assessing the compliance and suitability of the design documentation prior to construction is one of the key factors in ensuring safety, quality, and investment efficiency. For the Vung Xec Hai Phong Project, SVG Engineering provides consultancy services for the appraisal of the Feasibility Study Report and the Construction Drawing Design for the Shoreline Protection Works and Technical Infrastructure of the project.