CONSTRUCTION PROJECT MANAGEMENT CONSULTING AND CONSTRUCTION SUPERVISION OF SENAO NETWORKS VIETNAM FACTORY - PHASE 1 - VIETNAM

23/5/2025 | 32 views

Construction project management consultancy and construction supervision are the "keys" to turning construction ideas into reality effectively, with quality and legally. This is an indispensable part of any construction project, especially large projects such as factories, industrial parks... Below is the Factory Construction Project 1 - Senao Networks Vietnam, implemented by Sao Viet Construction Design Consulting and Inspection Joint Stock Company (SVG Engineering) for project management consultancy and construction supervision.

CONSTRUCTION PROJECT MANAGEMENT CONSULTING AND CONSTRUCTION SUPERVISION OF SENAO NETWORKS VIETNAM FACTORY - PHASE 1 - VIETNAM

- Investor: Senao Networks Vietnam Co., Ltd.
- Address: Thai Ha Industrial Park - Ly Nhan District - Ha Nam Province - VietNam
- Construction Project: Factory Construction Phase I – Senao Networks Vietnam
- Supervision Unit: Sao Viet Construction Design Consulting and Inspection Joint Stock Company (SVG Engineering)
- Year of implementation: 2025

CONTENTS OF CONSTRUCTION PROJECT MANAGEMENT CONSULTING AND CONSTRUCTION SUPERVISION OF SENAO NETWORKS VIETNAM FACTORY - PHASE 1

- Provide project management consultancy, including but not limited to the following tasks: Review and check the progress of the construction contractor; Evaluate the current status of project implementation and understand the project implementation processes (Comply with Vietnamese law) to plan project management and control; Evaluate changes related to design, construction, construction materials, labor safety, environmental sanitation, fire prevention, testing, acceptance and handover. Propose appropriate measures to the Investor to ensure that the above changes do not affect the safety, quality and progress of project implementation.

-  Supervise construction stages and items, electricity and water, fire prevention and fighting, other construction works, construction work volume, construction quality, occupational safety and hygiene, environmental sanitation and record management.

- Construction progress must be carried out based on the construction progress table. Party B must always monitor the construction progress to promptly make recommendations and proposals, and must be present at the construction site daily to sign the construction diary and related documents.

- Check raw materials used for the project and sign documents and requests for use related to the project. If found inappropriate, request the contractor to immediately move them away.

- Carry out supervision work on all issues related to people: supervisors and workers sent by the Contractor (including Labor Safety) and environmental protection. If unsafe construction or environmental pollution risks are detected (or suspected), timely handling must be carried out immediately, including but not limited to proposing improvement plans and requesting to stop construction (must notify Party A in advance).

- Perform other supervisory work in accordance with Vietnamese law and management regulations of the Industrial Park.

*** Quality requirements:

The quality of project management consultancy and construction supervision performed by Party B shall comply with the regulations on current standards and regulations of the Vietnamese State and local industrial zones or as agreed by the two Parties, conducting supervision and management of construction quality, ensuring construction is in accordance with the design drawings, complying with regulations on construction quality management and regulations of AVTC, ensuring that Party A's requirements are met.

***Deliverables:

- Monthly project management consulting and construction supervision reports in Vietnamese - Chinese: Party B provides Party A with monthly reports on the items that the contractor has completed and is performing at the construction site, including reports on completed and accepted work during the reporting period, as well as comments, analysis and evaluation by the construction supervision department on quality, volume, progress, labor safety and environmental protection.

- Acceptance report for each item in Vietnamese - Chinese: After each construction stage is completed, Party B must conduct acceptance of the work volume of each completed construction stage. If there are any technical or quality problems, Party B must immediately notify Party A and propose a solution.

- Upon request by Party A, Party B must immediately report orally or prepare a written report of the incident in Vietnamese or Chinese.

- Control and confirm completion drawings, completion documents, and related completed work volume.

- Prepare a complete supervision consulting report in Chinese - Vietnamese and hand it over to Party A.

IMAGES OF CONSTRUCTION PROJECT MANAGEMENT CONSULTING AND CONSTRUCTION SUPERVISION OF SENAO NETWORKS VIETNAM FACTORY - PHASE 1

COST OF HIRING CONSTRUCTION PROJECT MANAGEMENT CONSULTING AND CONSTRUCTION SUPERVISION IN VIETNAM

Please immediately contact Hotline: 0902.593.686 (Mr. Thang) & Email: svg.engineer@gmail.com for support and advice on issues related to Construction project management consulting & Construction supervision Consulting in Viet Nam ... Best regards! 


VietNam construction consulting - Mr. Thang 0902.593.686

CONTACT US:

SAO VIET DESIGN CONSULTING AND CONSTRUCTION SUPERVISORY JOINT STOCK COMPANY

🏢 Hai Phong Office :

SVG Building, Bui Vien Street, Le Chan District
☎ Tel: (0225) 3.747.819
📞 Hotline: 0902.593.686
📧 Email: svg.engineer@gmail.com & svg.group2005@gmail.com

🌎 VietNam Website: giamsatcongtrinh.com 
🌎 English Website: en.giamsatcongtrinh.com
🌎 China Website: cn.giamsatcongtrinh.com

 Youtube Channel: https://www.youtube.com/@svgengineering

🏢 Representative offices:

1, Ha Noi: No. 9, Alley 81 Hoang Cau Street, Dong Da District, Ha Noi Capital
2, Hue: M25 Lot , Road 21, Dong A Thuy An, Thuy Duong Ward, Huong Thuy Commune, Thua Thien Hue Province
3, Ho Chi Minh: 2/1C Cao Thang Street, 05 Ward, 3 District, Ho Chi Minh City