With the goal of ensuring sustainable quality for key industrial projects, we are proud to undertake the role of Construction Supervision Consultant and Project Management for Factory Building B01 under Phase 5 of the Fulian Project. Located in Quang Chau Industrial Park, Bac Ninh Province, Vietnam - the project is one of the region’s major infrastructure highlights, requiring strict control over both technical standards and construction progress. The presence of SVG Engineering’s experienced engineers on site reflects our commitment to delivering a safe, high-quality project while optimizing investment efficiency.
CONSTRUCTION SUPERVISION CONSULTANCY AND PROJECT MANAGEMENT FOR FACTORY BUILDING B01 - FULIAN PHASE 5 PROJECT - QUANG CHAU INDUSTRIAL PARK - BAC NINH PROVINCE - VIETNAM
- Investor: Precision Technology Component Co., Ltd.
- Address: Quang Chau Industrial Park - Bac Ninh Province - Viet Nam
- Construction Project: Construction of factory building B01 - Fulian
- Supervision Unit: Sao Viet Construction Design Consulting and Inspection Joint stock Company (SVG Engineering)
- Year of implementation: 2026


CONTENTS OF CONSTRUCTION SUPERVISION CONSULTANCY AND PROJECT MANAGEMENT FOR FACTORY BUILDING B01 - FULIAN PHASE 5 PROJECT - QUANG CHAU INDUSTRIAL PARK - BAC NINH PROVINCE - VIETNAM
- Manage and supervise quality, quantities, progress, occupational safety, environmental protection, and fire prevention and fighting throughout the construction process until the completion acceptance of the entire project for operation and use.
- Prepare and implement the Project Management Plan, including supervision plans and management procedures related to quality, quantities, progress, occupational safety, environmental protection, fire prevention and fighting, inspection and acceptance procedures, document and record management during supervision and project management, as well as other necessary contents.
- Review and evaluate the suitability of the construction contractor’s capabilities, including manpower, construction equipment, specialized construction laboratories, and the quality management system of the construction contractor.
- Review the construction methods proposed by the contractor to ensure compliance with the approved design and construction method statements; approve the overall safety plan and detailed safety measures for specialized works or activities with high occupational safety risks during the construction process.
- Manage the handover of the construction site for execution in accordance with the agreement between Party A and the construction contractor; carry out construction site management activities.
- Review and approve submissions prepared by the construction contractor for Party A’s approval, and based on Party A’s comments, request the contractor to revise such submissions during the construction process to ensure compliance with actual site conditions and contractual requirements.
- Manage, inspect, and approve materials, structural components, construction products, and equipment installed in the Project.
- Manage the Project implementation schedule; adjust or revise the Project schedule when necessary, ensuring consistency with the overall master schedule and key milestones approved by Party A.
- Inspect and supervise the construction contractor and other contractors in carrying out construction activities at the site in accordance with the construction design requirements and the Project implementation schedule.
- Supervise the implementation of safety management regulations during the construction process; monitor safety measures for adjacent structures and oversee project monitoring and observation works.
- Require the construction contractor to provide detailed construction schedules for each work item, and to mobilize key personnel, workers, machinery, and equipment in accordance with the commitments stated in the bidding documents and construction contract.
- Maintain the construction site diary and review, inspect, and verify periodic reports as well as other reports submitted by the construction contractor and other contractors involved in the Project.
- Identify any errors or inconsistencies in the design (if any) and promptly propose recommendations for design adjustments to Party A.
- Request the contractor to suspend construction activities when the quality of the Project fails to meet technical requirements, when construction methods do not ensure safety, or when violations of occupational safety management regulations cause or may cause labor accidents and safety incidents; take the lead and coordinate with relevant parties to resolve difficulties and issues arising during the construction process, while also cooperating in handling and remedying incidents in accordance with the provisions of this Contract and applicable laws.
- Inspect and evaluate the results of tests conducted on materials, structural components, and construction products during the construction process, as well as other relevant documents serving the acceptance procedures; inspect and certify as-built drawings.
- Manage risks related to the Project; assess any changes or additional works arising during the Project implementation and propose appropriate measures to Party A to ensure that such changes or additions do not affect the safety, quality, or progress of the Project.
- Manage and organize verification tests in accordance with regulations to assess the quality of project components, work items, and the overall Project (if required).
- Manage and carry out acceptance procedures for construction phases or project components, as well as the final acceptance of the completed Project for operation and use; inspect and certify completed construction quantities; coordinate with Party A in the inspection and acceptance procedures conducted by competent authorities.
- Manage the preparation and storage of project completion dossiers and other Project-related documents.
- Manage the handover process of the Project.
- Supervise the training and operation guidance process for the Project; inspect and supervise the technology transfer carried out by contractors; assist Party A in understanding the operational mechanisms and necessary procedures related to the operation of the Project.
- Party B shall prepare and submit to Party A the consultancy deliverables, including:
- Construction Supervision Consultancy Plan and Project Management Plan;
- Periodic reports: daily, weekly, and monthly progress reports. Each report shall include the following main contents: overall Project status; quantities and quality of completed works compared with the approved plan; existing difficulties/issues and proposed corrective measures.
- Acceptance minutes for each project component: after each construction phase, acceptance procedures shall be carried out for completed project components to evaluate technical compliance, quality, and completed quantities, and to establish directions for the next phase.
- Reports prepared upon the organization of the final acceptance of the Project.
- Ad-hoc reports as requested by Party A.
- Other documents related to the consultancy services as required by Party A and in accordance with legal regulations.
- Participate together with Party A in working with competent state authorities to ensure that the Project is approved for acceptance and permitted for operation and use.
- Perform all obligations in accordance with the provisions of this Contract and applicable laws.
IMAGES OF CONSTRUCTION SUPERVISION CONSULTANCY AND PROJECT MANAGEMENT FOR FACTORY BUILDING B01 - FULIAN PHASE 5 PROJECT - QUANG CHAU INDUSTRIAL PARK - BAC NINH PROVINCE - VIETNAM










COST OF CONSTRUCTION SUPERVISION CONSULTANCY AND PROJECT MANAGEMENT FOR FACTORY BUILDING
Please immediately contact Hotline: 0902.593.686 (Mr. Thang) & Email: svg.engineer@gmail.com for support and advice on issues related to Construction Supervision Consulting and Project Management for Factory Building in Viet Nam ... Best regards!

VietNam construction consulting - Mr. Thang 0902.593.686
CONTACT US:
SAO VIET CONSTRUCTION DESIGN CONSULTING AND INSPECTION JOINT STOCK COMPANY
🏢 Hai Phong Office :
Address : 7th floor SVG Building - Bui Vien Street - An Bien Ward - Hai Phong City
☎ Tel: (0225) 3.747.819
📞 Hotline: 0902.593.686
📧 Email: svg.engineer@gmail.com
🌎 VietNam Website: giamsatcongtrinh.com
🌎 English Website: en.giamsatcongtrinh.com
🌎 China Website: cn.giamsatcongtrinh.com
Youtube Channel: https://www.youtube.com/@svgengineering
🏢 Representative offices:
- Ha Noi Branch Office : No. 9/ 81 Hoang Cau Street, Dong Da Ward, Hanoi Capital
- Ho Chi Minh Branch Office: 2/1C Cao Thang Street, Ban Co Ward, Ho Chi Minh City
- Hue Branch Office : M25 Lot , 21 Street, Dong Nam Thuy An, Thanh Thuy Ward, Hue City