SUPERVISING THE CONSTRUCTION OF THE QMHP STAFF HOUSING PROJECT​ (QUANTA PHASE 3) IN VIETNAM (NEXT PHASE)

23/2/2026 | 8 views

The implementation of construction supervision at the QMHP - Quanta Employees Housing Project (Phase 3) in its subsequent stages is carried out meticulously by SVG Engineering's team of civil engineers. This involvement plays a pivotal role in maintaining quality standards, controlling risks, and optimizing delivery timelines. Rather than serving as a mere technical controller, the construction supervision unit acts as a strategic bridge, transforming design blueprints into stable physical structures while supporting the investor in creating a standard and sustainable living environment for the QMHP - Quanta workforce.

SUPERVISING THE CONSTRUCTION OF THE QMHP STAFF HOUSING PROJECT​ (QUANTA PHASE 3) IN VIETNAM (NEXT PHASE)

- Investor: QMHP Co., Ltd.
- Address: My Thuan Industrial Park - My Loc Ward - Ninh Binh province - Viet Nam
- Construction Project: The staff housing Project - Quanta Phase 3
- Mission: Construction Supervision of QMHP staff housing Project - Next phase
- Supervision Unit: Sao Viet Construction Design Consulting and Inspection Joint stock Company (SVG Engineering)
- Year of implementation: 2026

CONTENTS OF SUPERVISING THE CONSTRUCTION OF THE QMHP STAFF HOUSING PROJECT (QUANTA PHASE 3) IN VIETNAM (NEXT PHASE)

1. Supervision of the Preparation and Foundation Phases:

  • Legal Document Review: Check construction permits, design documents, and construction contracts.

  • Surveying Supervision: Inspect and verify coordinate control networks and elevation levels. Ensure accurate positioning of the construction site according to the design.

  • Excavation and Leveling Supervision: Check slope gradient and landslide prevention measures.

  • Foundation Construction Supervision:

    • Piles: Monitoring the pile driving process (pressure, depth) and inspecting pile quality (static testing, ultrasonic testing).

    • Foundation/Pile Cap Concrete: Checking reinforcement (type, spacing, joints), formwork, and especially supervising the pouring process and taking concrete samples.

2. Supervision of the Structural Frame Phase:

  • Reinforcement steel supervision: This is the most time-consuming supervision task. Checking the quantity, diameter, and type of steel; the position of reinforcing steel and structural steel, especially at high-stress points such as frame joints, beams, and columns.

    • Requirement: Ensure the concrete cover (thickness) complies with regulations.

  • Concrete Supervision:

    • Check the concrete grade, the delivery note, and conduct on-site acceptance before pouring.

    • Supervise the vibratory compaction process and post-pouring curing (watering, covering).

    • Progress Acceptance: Only allow formwork removal and construction of the next floor when the concrete strength has reached the required level.

3. Supervision of the Completion Phase:

  • Supervision of bricklaying and plastering works: Check the vertical alignment and flatness of the walls. Ensure that the mortar joints and materials meet the required standards.

  • Mechanical and Electrical (M&E) System Supervision:

    • Electrical works: Inspect conduit routing, outlet and switch locations, electrical panel installation, and lighting system testing.

    • Water supply and drainage: Supervise the installation of supply and drainage pipelines, and perform pressure testing to detect leaks.

    • Fire Protection: Supervising the installation of fire protection equipment (sprinklers, fire alarms) and conducting acceptance testing of the system according to standards.

  • Interior/Exterior Installation Supervision: Inspect the quality of doors, flooring, wall cladding (flatness, grout lines), and painting. Ensure that the colors and materials match the samples approved by the client.

QUALITY MANAGEMENT OF  PROGRESS AND LABOR SAFETY

1. Quality Management and Documentation: 

  • Management System: The construction supervision consultant requires the contractor to prepare and comply with detailed construction methods and the quality management system.

  • Incoming Materials Acceptance​: All materials (steel, cement, sand, and gravel) must have valid Certificates of Origin/Certificates of Quality (CO/CQ) and must pass all required tests before being used. The supervising engineer has the authority to request material re-testing at any time.

  • Acceptance Procedure: The acceptance process is carried out in three levels: Contractor Internal Inspection → Supervision Consultant → Investor/Project Management Unit. All works must have a fully completed Acceptance Record before proceeding to the next step.

2. Construction schedule management: 

  • Plan Control: The Supervising Engineer monitors the actual progress against the approved Gantt chart.

  • Detection and Resolution of Delays: When progress is delayed, the Supervising Engineer must report to the Client and request the Contractor to provide corrective measures (e.g., overtime, increased manpower, adjustment of construction methods) to get the project back on track.

  • Resource Management: Ensure the Contractor has sufficient manpower, machinery, and materials for each critical phase.

3. Occupational Safety Management, Hygiene, and Environmental Ecology Management

  • Occupational Safety and Health Control: Regularly inspect scaffolding, work platforms, safety nets, railings, and lightning protection systems.

  • Personal Personal Protective Equipment (PPE): Ensure 100% of workers have helmets, shoes, and safety harnesses when working at heights.

  • Incident Prevention: Organize safety training sessions, conduct periodic equipment inspections, and develop incident response plans (fire prevention, evacuation).

IMAGES OF SUPERVISING THE CONSTRUCTION OF THE QMHP STAFF HOUSING PROJECT (QUANTA PHASE 3) IN VIETNAM (NEXT PHASE)

 

 

COST OF CONSTRUCTION SUPERVISION CONSULTING IN VIETNAM

Please immediately contact Hotline: 0902.593.686 (Mr. Thang) & Email: svg.engineer@gmail.com for support and advice on issues related to Construction Supervision Consulting in Viet Nam ... Best regards! 


VietNam construction consulting - Mr. Thang 0902.593.686

CONTACT US:

SAO VIET CONSTRUCTION DESIGN CONSULTING AND INSPECTION JOINT STOCK COMPANY

🏢 Hai Phong Office :

Address : 7th floor SVG Building - Bui Vien Street - An Bien Ward - Hai Phong City
☎ Tel: (0225) 3.747.819
📞 Hotline: 0902.593.686
📧 Email: svg.engineer@gmail.com

🌎 VietNam Website: giamsatcongtrinh.com 
🌎 English Website: en.giamsatcongtrinh.com
🌎 China Website: cn.giamsatcongtrinh.com

 Youtube Channel: https://www.youtube.com/@svgengineering

🏢 Representative offices:

  • Ha Noi  Branch Office : No. 9/ 81 Hoang Cau Street, Dong Da Ward, Hanoi Capital
  • Ho Chi Minh Branch Office: 2/1C Cao Thang Street, Ban Co Ward, Ho Chi Minh City
  • Hue Branch Office : M25 Lot , 21 Street, Dong Nam Thuy An, Thanh Thuy Ward, Hue City