Building on the success of the Geotube dike enclosure works, the Vung Xec Project in Do Son has now entered a key phase: the installation of a robust foundation pile system. Accompanying this pivotal stage, SVG Engineering continues to affirm its capabilities through on-site construction supervision consulting, ensuring that every pile position meets design specifications and providing a solid foundation for subsequent project phases.

CONSTRUCTION SUPERVISION CONSULTING FOR VUNG-XEC DO SON PROJECT (NEXT PHASE)

- Investor: Bao Tin Infrastructure Joint Stock Company 
- Address: Do Son Ward - Hai Phong City - Viet Nam
- Construction Project: Vung-Xec Project
- Mission: Construction Supervision Consulting
- Supervision Unit: Sao Viet Design Consulting and Construction Supervisory Joint stock Company (SVG Engineering)
- Year of implementation: 2025

SCOPE OF CONSTRUCTION SUPERVISION CONSULTING SERVICES VUNG XEC PROJECT – DO SON

I. Pre-Construction Preparation and Mobilization Phase

  1. Verification of legal commencement conditions
    Review and assess the project’s readiness for commencement in accordance with applicable legal requirements.

  2. Review of contractor capability
    Examine the conformity of the contractor’s mobilized personnel, machinery, and equipment with contractual commitments.

  3. Safety compliance control for equipment
    Approve machinery and materials subject to strict safety requirements based on valid licenses and inspection certificates.

  4. Approval of construction methodology
    Review and provide approval comments on construction organization plans and methodologies to ensure feasibility and effectiveness.

  5. Assessment of management systems
    Inspect the organizational structure and internal quality control procedures of the construction contractor.

  6. Inspection of supply facilities
    Conduct direct assessments of laboratories, manufacturing plants, workshops, and component fabrication facilities dedicated to the project.

  7. Control of incoming materials and equipment
    Supervise the origin, types, and specifications of construction materials and equipment; approve material samples prior to site use.

  8. Verification of quality certification
    Cross-check test results, Certificates of Origin (CO), Certificates of Quality (CQ), and reports issued by manufacturers and independent testing agencies to ensure compliance with technical standards.

  9. Safety and environmental supervision
    Establish supervision criteria and monitor compliance with occupational safety, environmental sanitation, and fire prevention requirements at the construction site.

II. Construction Execution and On-Site Quality Control Phase

  1. Continuous on-site supervision
    Maintain a permanent presence of the Supervision Consultant’s personnel at the construction site to closely monitor all construction activities.

  2. Compliance assurance
    Closely oversee the Contractor’s execution to ensure that all works strictly conform to the approved design documents and applicable construction standards and regulations.

  3. On-site material acceptance
    Conduct physical inspections and sign acceptance records for materials and equipment delivered to the site.

  4. Inspection and acceptance of construction stages
    Organize inspections and acceptance of transitional construction stages to ensure compliance with prescribed procedures and technical quality requirements.

  5. Surveying and monitoring system control
    Monitor and verify technical parameters including coordinates, elevations, control networks, and structural monitoring systems of the works.

  6. As-built documentation management
    Verify the accuracy of as-built drawings and provide certification in accordance with actual construction conditions.

  7. Design optimization and technical recommendations
    Proactively identify deficiencies or inconsistencies in technical documentation and recommend timely adjustments to the Employer or the Design Consultant.

  8. Independent quality testing and inspection
    Coordinate with the Employer to implement additional testing and inspection measures where there are indications of non-conforming quality.

  9. Handling of incidents and technical issues
    Act as the focal point for coordination among relevant parties to resolve arising difficulties and address technical issues at the construction site.

  10. Rectification of defects and non-conformities
    Propose and supervise technical solutions to thoroughly remedy defects or errors identified during construction.

  11. Reporting and financial control
    Compile and submit monthly progress reports to the Employer and certify completed work quantities as the basis for interim payments and final settlement.

IMAGES OF CONSTRUCTION SUPERVISION CONSULTING FOR VUNG-XEC DO SON PROJECT (NEXT PHASE)

COST OF CONSTRUCTION SUPERVISION CONSULTING IN VIETNAM

Please immediately contact Hotline: 0902.593.686 (Mr. Thang) & Email: svg.engineer@gmail.com for support and advice on issues related to Construction Supervision Consulting in Viet Nam ... Best regards! 


VietNam construction consulting - Mr. Thang 0902.593.686

CONTACT US:

SAO VIET CONSTRUCTION DESIGN CONSULTING AND INSPECTION JOINT STOCK COMPANY

🏢 Hai Phong Office :

Address : 7th floor SVG Building - Bui Vien Street - An Bien Ward - Hai Phong City
☎ Tel: (0225) 3.747.819
📞 Hotline: 0902.593.686
📧 Email: svg.engineer@gmail.com

🌎 VietNam Website: giamsatcongtrinh.com 
🌎 English Website: en.giamsatcongtrinh.com
🌎 China Website: cn.giamsatcongtrinh.com

 Youtube Channel: https://www.youtube.com/@svgengineering

🏢 Representative offices:

  • Ha Noi  Branch Office : No. 9/ 81 Hoang Cau Street, Dong Da Ward, Hanoi Capital
  • Ho Chi Minh Branch Office: 2/1C Cao Thang Street, Ban Co Ward, Ho Chi Minh City
  • Hue Branch Office : M25 Lot , 21 Street, Dong Nam Thuy An, Thanh Thuy Ward, Hue City