The verification of the Feasibility Study Report, Detailed Engineering Design, and Cost Estimates is a critical link in ensuring the safety and economic efficiency of the 'Embankment and Technical Infrastructure' project in Vung Xec, Do Son Ward. Strict control of technical parameters not only optimizes construction methods but also guarantees the structural sustainability against the harsh marine environment of Hai Phong. This represents a pivotal preparatory step to ensure the project proceeds on schedule and remains in full compliance with current legal regulations.
VERIFICATION OF FEASIBILITY STUDY REPORT, VERIFICATION OF CONSTRUCTION DRAWING DESIGN AND COST ESTIMATES
- Construction Project: Embankment and Technical Infrastructure Project
- Address: Do Son Ward - Hai Phong City - Viet Nam
- Verification unit : Sao Viet Design Consulting and Construction Supervisory Joint stock Company (SVG Engineering)
- Year of implementation: 2025
CONTENTS OF VERIFICATION OF FEASIBILITY STUDY REPORT, VERIFICATION OF CONSTRUCTION DRAWING DESIGN AND COST ESTIMATES
1- Verification of the Feasibility Study Report:
The scope of work for the verification of the Feasibility Study report includes a comprehensive assessment of the project's technical, financial, legal, and operational feasibility. Specifically, it involves verifying the project's alignment with urban planning, the effectiveness of the basic design options, cost estimates, capital recovery potential, and strict compliance with relevant legal regulations.
2- Verification of Detailed Engineering Design and Cost Estimates:
a- Verification of Detailed Engineering Design:
-
Alignment of the basic design with the detailed construction planning, the approved master plan, or the selected route options for linear infrastructure projects.
-
Consistency of the basic design with the construction site location and its integration capability with the regional technical infrastructure.
-
Suitability of selected technological solutions and production lines for projects with specific industrial or technological design requirements.
-
Appropriatness of design solutions regarding construction safety, environmental protection, and fire prevention and fighting (FPF).
-
Compliance with technical codes and standards applied in the design process.
-
Evaluation of the legal qualifications and professional capacities of the design consultancy organization and individual practitioners.
-
Consistency of the project execution plan (by phases or work items) with the requirements of the basic design.
b- Verification of Cost Estimates:
-
Verification of the consistency between the major quantities in the cost estimate and the design quantities.
-
Review of the accuracy and applicability of construction unit prices, percentage-based norms, consultancy fees, and other cost items within the project’s total estimate.
-
Determination of the final project cost estimate.
IMAGES OF VERIFICATION OF FEASIBILITY STUDY REPORT, VERIFICATION OF CONSTRUCTION DRAWING DESIGN AND COST ESTIMATES










COST OF VERIFICATION OF FEASIBILITY STUDY REPORT, VERIFICATION OF CONSTRUCTION DRAWING DESIGN AND COST ESTIMATES
Please immediately contact Hotline: 0902.593.686 (Mr. Thang) & Email: svg.engineer@gmail.com for support and advice on issues related to Verification of feasibility study report and verification of construction drawing in Viet Nam ... Best regards!

VietNam construction consulting - Mr. Thang 0902.593.686
CONTACT US:
SAO VIET CONSTRUCTION DESIGN CONSULTING AND INSPECTION JOINT STOCK COMPANY
🏢 Hai Phong Office :
Address : 7th floor SVG Building - Bui Vien Street - An Bien Ward - Hai Phong City
☎ Tel: (0225) 3.747.819
📞 Hotline: 0902.593.686
📧 Email: svg.engineer@gmail.com
🌎 VietNam Website: giamsatcongtrinh.com
🌎 English Website: en.giamsatcongtrinh.com
🌎 China Website: cn.giamsatcongtrinh.com
Youtube Channel: https://www.youtube.com/@svgengineering
🏢 Representative offices:
- Ha Noi Branch Office : No. 9/ 81 Hoang Cau Street, Dong Da Ward, Hanoi Capital
- Ho Chi Minh Branch Office: 2/1C Cao Thang Street, Ban Co Ward, Ho Chi Minh City
- Hue Branch Office : M25 Lot , 21 Street, Dong Nam Thuy An, Thanh Thuy Ward, Hue City