Structural calculation verification is not merely a mandatory administrative procedure under current regulations (such as the Construction Law and relevant Decrees), but also an independent validation step to eliminate potential risks, optimize investment costs, and ensure absolute safety for workers and interior functional designs. SVG Engineering serves as the structural calculation verification consultant for the Super Victory Thai Binh Manufacturing Plant Project, located in Tan Minh Industrial Park.
STRUCTURAL CALCULATION VERIFICATION CONSULTANCY FOR SUPER VICTORY THAI BINH MANUFACTURING PLANT PROJECT
- Investor: Super Victory Thai Binh Co., Ltd.
- Address: Tan Minh Industrial Park - Thai Binh Province - Viet Nam
- Construction Project: Structural calculation verification for factory/plant project
- Design Verification Unit: Sao Viet Construction Design Consulting and Inspection Joint stock Company (SVG Engineering)
- Year of implementation: 2025

CONTENTS OF STRUCTURAL CALCULATION VERIFICATION CONSULTANCY FOR SUPER VICTORY THAI BINH MANUFACTURING PLANT PROJECT
I. Structural Calculation Verification for 04 Workshops: Comparison and Safety Assessment
The primary mission of the verification consultancy is to conduct a comprehensive review and recalculation of the entire structural system, including steel frames, columns, and foundations for all four workshops. The core objective is to provide an objective conclusion regarding the structural load-bearing capacity in comparison with the previously appraised and approved design drawings.
a. Detailed Review Scope
-
Load and Action Analysis: The Consultant will reconstruct mathematical models to verify various loads acting on the workshops, including: dead loads (self-weight of the structure, roof, and walls), roof live loads, wind loads, and crane loads (if applicable).
-
Strength and Stability Check: Specialized software (such as SAP2000, ETABS, etc.) will be utilized to check the stresses in steel components, purlin deflection, and horizontal displacement (drift) of the workshop frames.
-
Foundation System Verification: Evaluation of the soil bearing capacity and foundation structures to ensure no uneven settlement or settlement exceeding the allowable limits.
b. Comparison with Approved Documentation
Upon obtaining independent calculation results, the Verification Consultant will perform a direct comparison with the approved Appraised Drawings. Any discrepancies (if identified) will be analyzed based on the following criteria:
-
Compliance with Codes and Standards: Does the original design align with the latest standards (e.g., TCVN 2737:2023 on Loads and Actions)?
-
Safety Margin: Does the current structure have an excess or a deficit in load-bearing capacity? Excessive redundancy leads to material waste, whereas a deficit poses a direct safety hazard.
In the event that verification results indicate the original design is unsafe or no longer aligns with the actual requirements of the Super Victory plant, the consultant’s role will transition to a critical review and evaluation of renovation alternatives.
II. Analysis of Causes for Substandard Original Design
The deficit in structural safety may stem from several factors:
-
Inaccuracies during the initial stages: Errors in geological surveys or initial design calculations.
-
Changes in functional requirements: Installation of heavier machinery or relocation of production lines.
-
Changes in external factors: Increased wind pressure in the project area.
III. Evaluation Criteria for Renovation Solutions
When the Contractor proposes renovation measures (column strengthening, additional bracing systems, foundation expansion, etc.), the Verification Consultant will evaluate them based on the following key pillars:
-
Technical Feasibility: Does the solution thoroughly address the identified structural weaknesses? Will the proposed construction methods impact other existing structural components?
-
Economic Viability: A cost-benefit analysis between strengthening versus replacement. Which solution offers long-term benefits for the Investor?
-
Implementation Schedule: Renovation often occurs during critical project phases. The Consultant will assess whether the contractor's solution accelerates or extends the overall construction timeline.
SVG ENGINEERING: THE STRUCTURAL CALCULATION VERIFICATION CONSULTANT FOR THE SUPER VICTORY THAI BINH PLANT PROJECT
- The structural verification consultancy at the Super Victory Thai Binh Plant is more than just checking numbers; it is a collaborative journey with the Investor to build a project that is safe, resilient, and efficient. A high-quality verification report serves as a "shield," protecting the project from technical risks while affirming the prestige and responsibility of all stakeholders involved.
- With a team of seasoned structural engineers and experts at SVG Engineering, supported by advanced calculation software, we are committed to providing precise and objective assessments. Our goal is to ensure the Super Victory project commences stable operations promptly, contributing to the economic growth of Thai Binh Province.
IMAGES OF STRUCTURAL CALCULATION VERIFICATION CONSULTANCY FOR SUPER VICTORY THAI BINH MANUFACTURING PLANT PROJECT









COST OF STRUCTURAL CALCULATION VERIFICATION OF FACTORY/WORKSHOP CONSTRUCTION IN VIETNAM
Please immediately contact Hotline: 0902.593.686 (Mr. Thang) & Email: svg.engineer@gmail.com for support and advice on issues related to Structural calculation verification of Factory/Workshop construction in Viet Nam ... Best regards!

VietNam construction consulting - Mr. Thang 0902.593.686
CONTACT US:
SAO VIET CONSTRUCTION DESIGN CONSULTING AND INSPECTION JOINT STOCK COMPANY
🏢 Hai Phong Office :
Address : 7th floor SVG Building - Bui Vien Street - An Bien Ward - Hai Phong City
☎ Tel: (0225) 3.747.819
📞 Hotline: 0902.593.686
📧 Email: svg.engineer@gmail.com
🌎 VietNam Website: giamsatcongtrinh.com
🌎 English Website: en.giamsatcongtrinh.com
🌎 China Website: cn.giamsatcongtrinh.com
Youtube Channel: https://www.youtube.com/@svgengineering
🏢 Representative offices:
- Ha Noi Branch Office : No. 9/ 81 Hoang Cau Street, Dong Da Ward, Hanoi Capital
- Ho Chi Minh Branch Office: 2/1C Cao Thang Street, Ban Co Ward, Ho Chi Minh City
- Hue Branch Office : M25 Lot , 21 Street, Dong Nam Thuy An, Thanh Thuy Ward, Hue City