Supervision of industrial park factory construction is one of the strong areas of Sao Viet Design Consulting and Construction Supervisory Joint stock Company (SVG Engineering). We were granted a Certificate of Competency in the scope of construction activities by the Ministry of Construction: Consulting and supervising the construction of Class 1 Civil and Industrial Buildings. SVG Engineering participates in many small and large scale projects, trusted and satisfied by domestic and foreign Investors/Business Owners in China, Korea, Japan,... Below is a Hua Zhuang Electronics (Vietnam) factory project supervised by SVG Engineering in early 2025, please refer to:
SUPERVISION OF HUA ZHUANG ELECTRONICS (VIET NAM) FACTORY STAGE 2
- Investor: (Viet Nam) Hua Zhuang Electronics Company Limited
- Address: Dong Van II Industrial Park - Ha Nam Province - Viet Nam
- Construction Project: Hua Zhuang Electronics Factory Project in Viet Nam - Stage 2
- Supervision Unit: Sao Viet Design Consulting and Construction Supervisory Joint stock Company (SVG Engineering)
- Year of implementation: 2025
CONTENTS OF SUPERVISION OF HUA ZHUANG ELECTRONICS (VIET NAM) FACTORY STAGE 2
- Supervise the stages and items of construction, electricity, water, and technical infrastructure (except fire protection, elevators, electricity supplied to technology, equipment, and transformer stations). quality of construction work, construction quality, and labor safety and hygiene, environmental hygiene and document management.
- Construction progress must be carried out based on the construction progress table. Party B must always monitor the progress of the project to promptly propose recommendations, and at the same time be present at the construction site every day to sign the construction diary and related documents.
- Check the materials used for the project and sign documents and materials requiring use related to the project. If found unsuitable, request the contractor to immediately relocate.
- Carry out supervision of all human-related matters; Supervisors and workers dispatched by the Construction Contractor (including Labor Safety) and environmental protection, if detecting (or suspecting) unsafe construction or risk of environmental pollution, shall must immediately carry out timely handling, including but not limited to proposing an improvement plan requiring construction stoppage (must notify terminal A in advance).
- Carry out other supervision work according to the provisions of Vietnamese law and other management regulations of the Industrial Park.
- Quality requirements: The quality of construction supervision consulting is carried out by Party B in accordance with the current regulations and standards of the State of Vietnam and local industrial parks or according to the agreement of the two parties, conduct construction quality management supervision, ensure construction is in accordance with design drawings, comply with regulations on construction quality management, and ensure Party A's requirements.
- Delivered products: Weekly construction supervision report in Vietnamese - Chinese: Party B provides Party A with weekly reports on the construction items completed and being performed by the contractor at the construction site, including a report on work completed and accepted during the reporting period, comments and analysis of the construction supervision department on quality, volume, progress, labor safety and environmental protection.
- Acceptance report for each item in Vietnamese - Chinese version: After each completed construction stage, Party B must carry out acceptance of the workload of each completed construction stage. If there are any problems regarding technical or quality issues, Party B must immediately notify Party A, and provide a solution.
- Control and sign to confirm as-built drawings, as-built documents, and related completed work volume.
- Prepare a complete construction supervision consulting report in Chinese - Vietnamese and hand it over to Party A.
IMAGES OF SUPERVISION OF HUA ZHUANG ELECTRONICS (VIET NAM) FACTORY STAGE 2
COST OF FACTORY/WORKSHOP CONSTRUCTION SUPERVISION IN VIETNAM
Please immediately contact Hotline: 0902.593.686 (Mr. Thang) & Email: svg.engineer@gmail.com for support and advice on issues related to Factory/Workshop/Plant construction supervision in Viet Nam ... Best regards!
VietNam construction consulting - Mr. Thang 0902.593.686
CONTACT US:
SAO VIET DESIGN CONSULTING AND CONSTRUCTION SUPERVISORY JOINT STOCK COMPANY
🏢 Hai Phong Office :
SVG Building, Bui Vien Street, Le Chan District
☎ Tel: (0225) 3.747.819
📞 Hotline: 0902.593.686
📧 Email: svg.engineer@gmail.com & svg.group2005@gmail.com
🌎 VietNam Website: giamsatcongtrinh.com
🌎 English Website: en.giamsatcongtrinh.com
🌎 China Website: cn.giamsatcongtrinh.com
Youtube Channel: https://www.youtube.com/@svgengineering
🏢 Representative offices:
1, Ha Noi: No. 9, Alley 81 Hoang Cau Street, Dong Da District
2, Ho Chi Minh: 2/1C Cao Thang Street, 05 Ward, 3 District