STRUCTURAL CONDITION ASSESSMENT OF INLAND WATERWAY TERMINAL NO. 189 (WHARF AND SLIPWAY)

25/11/2026 | 7 views

Construction quality inspection plays an important role in assessing the existing condition, load-bearing capacity, and safety of structural components throughout the operation and service life of a facility. In particular, for inland waterway terminals, which are frequently exposed to aquatic environments, vessel loads, and operational conditions, periodic inspections and assessments are essential to ensure structural safety and maintain the service life of the facility. Recently, Sao Viet Construction Design Consultancy and Inspection Joint Stock Company (SVG Engineering) carried out site surveys and construction quality inspections at Inland Waterway Terminal No. 189, covering the wharf and slipway structures.

STRUCTURAL CONDITION ASSESSMENT OF INLAND WATERWAY TERMINAL NO. 189 (WHARF AND SLIPWAY)

  • Project: Inland Waterway Terminal No. 189

  • Location: Km14+130 – Km14+180, right bank of the Lach Tray River channel, Kien An Ward, Hai Phong City, Vietnam.

  • Project Owner: 189 One Member Limited Liability Company

  • Inspection Consultant: Sao Viet Construction Design Consultancy and Inspection Joint Stock Company (SVG Engineering)

  • Year of Implementation: 2026​

SCOPE OF STRUCTURAL CONDITION ASSESSMENT OF INLAND WATERWAY TERMINAL NO. 189 (WHARF AND SLIPWAY)

Based on a visual inspection of the inland waterway terminal, the wharf is identified as a fixed-type structure. Its deck is constructed of reinforced concrete (RC), supported by an underlying structural system consisting of reinforced concrete piles arranged along the wharf alignment. The waterside face of the wharf directly adjoins the water area designated for the berthing of inland waterway vessels.

  • Wharf dimensions: 26.1 m × 13 m, with a reinforced concrete structure.

  • Wharf type: Specialized inland waterway terminal for the construction and repair of Class II inland waterway vessels.

  • Land area of the terminal: According to the Land Use Rights Certificate (S = 20,161 m²).

  • Water area of the terminal:

    • Length: 39 m, extending downstream from the upstream end along the riverbank.

    • Width: 7 m, measured from the outer edge of the wharf towards the river.

PURPOSE OF THE SITE SURVEY AND STRUCTURAL INSPECTION

The purpose of the survey and inspection is to conduct periodic assessments, measurements, and evaluations of the existing condition and load-bearing capacity of the inland waterway terminal structure, ensuring its safety for vessel berthing, new vessel construction, and repair operations.

INSPECTION RESULTS

1. Wharf Deck and Floor Slab

The existing concrete surface is generally smooth and level, with no unusual signs of deterioration apart from moss and algae growth resulting from operational use and environmental exposure.

On the front vertical face of the wharf, the concrete exhibits moss and algae growth, together with localized surface abrasion, particularly along the outer edge and at the connections with the supporting structural members below. The vehicle restraint curbs around the wharf show no signs of chipping or spalling.

2. Beam, Pile and Supporting Column Systems

The beam, pile, and supporting column systems of the inland waterway terminal are constructed of reinforced concrete, with the following structural dimensions:

  • Transverse beams: 300 × 1,000 mm.

  • Longitudinal beams: 300 × 500 mm.

  • Load-bearing pile system: Reinforced concrete piles measuring 400 × 1,000 mm, arranged along the wharf alignment.

  • Supplementary strengthening support columns: 400 × 400 mm.

  • Floor slab thickness: 100 mm.

Visual inspection indicates that the surfaces of concrete members exposed to the water environment show signs of weathering and dirt accumulation. Localized chipping and spalling are observed at certain corners, edges, and surface areas of the structural members.

3. Concrete Compressive Strength Testing at Six Locations

No. Test Location Test Result (kg/cm²)
1 V1: Wharf impact protection wall 459.9
2 V2: Wharf beam face (front side) 434.9
3 V3: Wharf deck and floor slab 371.6
4 V4: Wharf impact protection wall face 455.3
5 V5: Wharf deck and floor slab 361.5
6 V6: Wharf impact protection wall face (inner side) 467.9

Note: Refer to Appendix 03 for detailed test results.

4. Vessel Impact Protection Structures and Mooring Systems (Mooring Posts and Shore Bollards)

The concrete surface of the front impact protection wall is in generally normal condition. However, the rubber fender units exhibit scratches, wear, and signs of aging. The rubber fenders are secured through welded steel connections to base plates, while the protective steel mesh frame shows localized deformation.

The mooring posts (shore bollards) show no signs of deformation but exhibit rust and corrosion due to frequent exposure to humid conditions, as well as the effects of climatic and aquatic environments. The protective paint coating shows signs of peeling and deterioration, reducing its effectiveness in preventing corrosion.

5. Load Testing and Displacement Monitoring

At the time of inspection, a passenger vessel with an approximate displacement of 70 tonnes was berthed at the terminal and undergoing completion works.

Observations of the structural response and displacement indicated only negligible movement.

CONCLUSIONS AND RECOMMENDATIONS

1. Conclusion

Based on the applicable standards TCVN 2737:2023, TCVN 5574:2018, and TCVN 9381:2012 concerning structural design loads, reinforced concrete structures, and guidelines for assessing the level of structural danger, together with the results of the structural condition assessment:

Sao Viet construction design consulting and inspection joint stock company (SVG Engineering) conducted site surveys, inspections, and measurements of the existing structural conditions and concluded that:

At the time of inspection, Inland Waterway Terminal No. 189 meets the structural load-bearing safety requirements for vessel berthing, new vessel construction, and repair operations involving vessels with a maximum load capacity of approximately 150–200 DWT.

2. Recommendations
  • For concrete structural members: Areas exhibiting cracking, delamination, or localized chipping and spalling should undergo localized repair and remediation. Exposed areas should be properly cleaned and treated to protect the reinforcing steel against corrosion.

  • For steel structural members: Components showing signs of rust, corrosion, or peeling protective coatings should be cleaned and recoated with a specialized anti-corrosion coating system.

  • For maintenance and inspection: The Project Owner is advised to maintain a regular inspection and structural assessment schedule for the entire facility in accordance with applicable regulations.

  • For underwater structural components: Specialized inspections should be conducted periodically and following any abnormal events. All repair, strengthening, and maintenance works must be carried out in accordance with the approved design documents, technical requirements, and applicable regulations. Upon completion, the works must be inspected and accepted, and the facility's management and maintenance records must be updated. Periodic structural condition assessments of the wharf should also be maintained.

  • For continued operation: The facility must continue to operate within the load limits, vessel specifications, operating conditions, and safety requirements established in the structural inspection and assessment report.

SVG ENGINEERING – A REPUTABLE CONSTRUCTION QUALITY INSPECTION AND ASSESSMENT COMPANY
  • With 20 years of experience in construction consultancy, construction appraisal and quality inspection, Sao Viet construction design consulting and inspection joint stock company (SVG Engineering) provides a wide range of services, including construction surveys, structural inspections, and construction quality assessments across various sectors.

  • Through the Inland Waterway Terminal No. 189 inspection project, SVG Engineering continues to demonstrate its professional expertise in surveying, assessing existing structural conditions, and evaluating structural load-bearing safety for facilities with specialized structural systems that are frequently exposed to environmental conditions and operational loads.

​

COST OF CONSTRUCTION INSPECTION IN VIETNAM

Please immediately contact Hotline: 0902.593.686 (Mr. Thang) & Email: svg.engineer@gmail.com for support and advice on issues related to Construction Inspection in Viet Nam ... Best regards! 


VietNam construction consulting - Mr. Thang 0902.593.686

 

CONTACT US:

SAO VIET CONSTRUCTION DESIGN CONSULTING AND INSPECTION JOINT STOCK COMPANY

🏢 Hai Phong Office :

Address : 7th floor SVG Building - Bui Vien Street - An Bien Ward - Hai Phong City
☎ Tel: (0225) 3.747.819
📞 Hotline: 0902.593.686
📧 Email: svg.engineer@gmail.com

🌎 VietNam Website: giamsatcongtrinh.com 
🌎 English Website: en.giamsatcongtrinh.com
🌎 China Website: cn.giamsatcongtrinh.com

 Youtube Channel: https://www.youtube.com/@svgengineering

🏢 Representative offices:

  • Ha Noi  Branch Office : No. 9/ 81 Hoang Cau Street, Dong Da Ward, Hanoi Capital
  • Ho Chi Minh Branch Office: 2/1C Cao Thang Street, Ban Co Ward, Ho Chi Minh City
  • Hue Branch Office : M25 Lot , 21 Street, Dong Nam Thuy An, Thanh Thuy Ward, Hue City