After completing the technical design documents of the industrial park factory project, the design consultancy unit will conduct the verification of the technical design. Specifically, to check whether the design project steps are correct, the process or not, and whether it is effective or not. From there, the new construction phase moved to the construction of the project.

INSPECTION OF TECHNICAL DESIGN DOCUMENTS

Technical design appraisal is an extremely important step that should not be overlooked to ensure the quality and accuracy of construction design documents. With more than 15 years of operation, Sao Viet Design Consulting and Construction Supervisory Joint Stock Company (SVG Engineering) is capable, qualified and experienced in the field of verifying technical design documents of industrial plants in Hai Phong city as well as many other provinces across the country.

The verification of engineering design documents is very meaningful, specifically checking whether the design project (engineering design file) is done in the right process or not, in accordance with the standards construction and purpose of the Investor or not. The results of the technical design verification will be made into a report to make comments and judgments about the unreasonable places. From there, the Design Consultant will make suggestions by providing solutions, directions for editing, changing and overcoming to make the project more complete.

The process of verifying the technical design of the work will be handled by the company implementing the design project. Therefore, business owners need to be really wise in choosing a design consulting and design verification unit.

The unit has many years of practical experience in the field of construction with a team of qualified and qualified verification experts will effectively support the Investor to carry out the verification work in the most accurate and effective way. Good design verification will bring a lot of benefits to management and administration during project implementation.

INSPECTION OF TECHNICAL DESIGN DOCUMENTS INDUSTRIAL PARK FACTORY

Verification of technical design documents, verification of cost estimates is one of the necessary and important tasks in the process of implementing an investment project to build an industrial park factory.

The steps to verify the technical design of the industrial park factory are carried out according to a strict process, in compliance with the regulations of the State and the law related to the construction quality management process in Vietnam.

SVG Engineering has strengths in the field of design - construction planning, quality inspection of works as well as verification and appraisal of technical design documents, basic design... In addition, the individuals in charge of the title of design manager and design leader of SVG are all capable of practicing construction design and have practicing certificates appropriate to the requirements of the type and grade of works. Therefore, we have obtained successful results from the bidding packages to verify the technical design documents of the industrial park project. SVG Engineering brings satisfaction and trust to customers and investors by the standard and methodical process of verifying the technical design of the factory, with a professional working style and high sense of responsibility. 

Tham tra ho so thiet ke ky thuat cong trinh du an nha may khu cong nghiep

CONTENTS OF TECHNICAL DESIGN ASSESSMENT OF INDUSTRIAL PARK FACTORY WORKS

1. The suitability of the construction design of the following step compared to the design of the previous step:

a) Technical design versus basic design;

b) Construction drawing design versus engineering design in case of three-step design, basic design in case of two-step design, or design task in case of one-step design.

2. The rationality of construction design solutions.

3. Compliance with applicable standards, technical regulations and legal regulations on the use of construction materials for works.

4. Evaluate the suitability of design solutions with the use of industrial park factory projects, the level of construction safety and the safety of neighboring works.

5. The rationality of the selection of technological lines and equipment for the design of works with technological requirements.

6. Compliance with regulations on environmental protection, fire and explosion prevention and control.

7. The compatibility between the main volume of the estimate with the design volume; the correctness and rationality of the application and application of work construction norms and unit prices; determine the estimated value of the project.

8. Capacity conditions of organizations and individuals conducting construction survey and design.

If you are looking for a unit to verify the design of construction drawings and estimate the work, you can trust us to entrust the task.

 

CONTACT INFORMATION: 

SAO VIET DESIGN CONSULTING AND CONSTRUCTION SUPERVISORY JOINT STOCK COMPANY

Hai Phong Office: 

SVG Building - Bui Vien Street - Le Chan District - Hai Phong City 

Tel: (0225) 3.747.819

Website: giamsatcongtrinh.com & en.giamsatcongtrinh.com

Hotline: 0902.593.686 - 0936.547.819

Email: svg.group2005@gmail.com & svg.engineer@gmail.com

Branch office: 

1, Ha Noi Branch Office: No. 9, Alley 81 Hoang Cau Street, Dong Da District, Hanoi Capital

2, Ho Chi Minh Branch Office: 2/1C Cao Thang Street, 05 Ward, 3 District, Ho Chi Minh City