Inspecting the structure of the factory to install the rooftop solar battery system is a prerequisite activity ensure the safety and sustainable use of the factory from time to timebefore the investor needs it.

Currently, installing solar panels on the roof with many benefits, such as reducing electricity costs, cooling factories, and contributing to reducing emissions, protecting the environment is gradually becoming an energy solution that investors need to install for factory. If you are in need of installing a solar battery system for your factory, the following article by SVG Engineering would like to share with you important notes when inspecting the project, before installing this system.

SVG EXPERTS ADVICE GUARANTEE SAFETY BEFORE INSTALLING THE ROOF SOLAR BATTERY SYSTEM

With more than 17 years of experience and an expert in the field of structural construction inspection of factories in industrial parks in Hai Phong as well as in other provinces and cities in the Vietnam, Sao Viet Design Consulting and Construction Supervisory Joint stock Company (SVG Engineering) gives sincere advice to investors, business owners factories that need to check in detail and thoroughly on the structure of factory buildings have enough bearing capacity for installing solar panels on the roof or not before installing this system.


SVG is a reputable factory inspection unit before installing rooftop solar panel system in Vietnam

WHY HAS TO INSPECT THE FACTORY STRUCTURE WHEN INSTALLING THE ROOF SOLAR BATTERY SYSTEM?

- Before installation, it is necessary to inspect the factory structure and calculate the bearing capacity of the factory structure when installing more solar panels on the roof of the factory building to ensure the installation of solar panels is safe. Some factory buildings due to failure to carry out factory inspection or inaccurate inspection caused the result that the factory structure was damaged and roof collapsed.


The roof of the factory collapsed due to the failure to inspect the factory structure to install the solar battery system

- The load of solar panels installed on the roof in a certain period of time is one of the main causes of load-bearing structures of factory buildings such as columns, trusses, and purlins that are not capable of bearing forces, gradually tired, leading to collapse of the entire steel truss frame, corrugated iron roof, purlin.

- Therefore, when installing a solar panel system, it is necessary to have an independent construction inspection unit to check the entire design document and inspecting at the factory site with the naked eye and uses construction inspection equipment to detect and propose a plan to adjust the components that do not ensure the bearing capacity to ensure safety when Installing a solar panel system.

CAN WHAT UNIT INSPECT THE STRUCTURE OF THE FACTORY BEFORE INSTALLING THE SOLAR BATTERY SYSTEM?

SVG Engineering is a unit with more than 17 years of expertise and experience in the field of structural inspection of the factory, we guarantee about the inspection and assessment of the safety of the factory structure before installing the solar battery system on rooftop.


SVG is a reputable factory inspection unit before installing rooftop solar panel system in Vietnam

SVG ENGINEERING PROCESS ABOUT INSPECTING STRUCTURE OF  FACTORY BEFORE INSTALLING THE SOLAR BATTERY SYSTEM AS FOLLOWS: 

- SVG Engineering observes and inspects the current status of the factory building visually to determine the damages of the building that affect the existing bearing capacity of the factory building before installing the solar battery system.


SVG Engineering visually inspects the current status of factory building

- Check the geometrical dimensions of the main load-bearing steel structures of the factory building such as columns, beams, and floors to ensure the safety of the building when installing the solar battery system on the roof.


SVG Engineering checks the geometrical dimensions of the main load-bearing steel structures of the factory building

- Test concrete strength at some typical bearing positions (if the structure is reinforced concrete) by bouncing gun and reinforced concrete ultrasonic machine.


SVG Engineering tests concrete strength at some typical bearing positions by bouncing gun


SVG Engineering tests concrete strength at some typical bearing positions by reinforced concrete ultrasonic machine

- Check the diameter and number of bolt connections at some typical load-bearing connection positions for the installation of solar panel systems on the roof.


SVG Engineering checks the diameter and number of bolt connections at some typical load-bearing connection positions

- Check the displacement of the load-bearing members of the factory: Check the deflection of the trusses, roof beams and the verticality of the columns, so that there can be forecasts about the project's displacement during construction and after installating of rooftop solar panel system.


SVG Engineering checks the displacement of the load-bearing members of the factory

- Calculating and checking the bearing capacity of the factory structure when installing solar power on the roof in accordance with current regulations and standards in Vietnam. 

- SVG Engineering will give some solutions on reinforcing the structure of the factory building if the building does not guarantee the bearing capacity for the installation of the rooftop solar battery system.

- Making factory construction inspection report.

SOME CONSTRUCTION INSPECTION PROJECTS OF SVG ENGINEERING

No. 

Construction inspection projects

Address

1

Construction inspection of Sunrise factory

Bao Minh Industrial Park, Nam Dinh Province

2

Construction inspection of DongKang Plant

Deep C2B Industrial Park, Hai Phong City

3

Construction inspection of BaoShen Workshop 

Trang Due Industrial Park, Hai Phong City

 

COST ESTIMATE OF FACTORY INSPECTION BEFORE INSTALLING THE SOLAR BATTERY SYSTEM ON ROOFTOP

Please immediately contact HOTLINE 0902.593.686 (Mr. Thang) and Email: svg.engineer@gmail.com for support and advice on issues related to factory construction inspection in Vietnam. Best regards!


SVG is a reputable factory inspection unit before installing rooftop solar panel system in Vietnam

CONTACT INFORMATION: 

SAO VIET DESIGN CONSULTING AND CONSTRUCTION SUPERVISORY JOINT STOCK COMPANY

Hai Phong Office: 

SVG Building - Bui Vien Street - Le Chan District - Hai Phong City 

Tel: (0225) 3.747.819

Website: giamsatcongtrinh.com & en.giamsatcongtrinh.com

Hotline: 0902.593.686

Email: svg.group2005@gmail.com & svg.engineer@gmail.com

Branch office: 

1, Ha Noi Branch Office: No. 9, Alley 81 Hoang Cau Street, Dong Da District, Hanoi Capital

2, Ho Chi Minh Branch Office: 2/1C Cao Thang Street, 05 Ward, 3 District, Ho Chi Minh City