SVG engineering confidently affirms the golden brand in the field of prestigious and professional construction supervision. SVG engineer has done a good job of supervising the construction of pre-engineered steel buildings in Hai Phong and across the country.
CONSTRUCTION SUPERVISION FOR QUALITY AND CONSCIOUS STEEL CONSTRUCTION
Pre-engineered steel building is a housing product made of light steel structures, good insulation, soundproofing, high aesthetics, designed according to specific specifications at the factory to suit the needs of customers. design the premises, in accordance with the purpose of use and the needs of the people. Steel frame house is a type of house that is linked together from individual parts. All structures and accessories of the house such as columns, beams, walls, roofs, windows, doors... are calculated and manufactured precisely at the factory according to each module. After completion, it will be brought to the construction site and assembled. The parts that make up the complete pre-engineered steel building will be linked together by screws and bolts.
Construction supervision for quality and dedicated prefabricated houses in Hai Phong
If you want to save time, effort and complete the prefab house with peace of mind, it is necessary for homeowners to ask for the help and companionship of a party specializing in supervising the construction of prefabricated houses. Construction supervision for pre-engineered steel buildings will reduce risks and timely detect errors and technical errors. This is a problem that often occurs during construction, if the errors are not detected in time, the investor will cost and time to repair. The important thing is that the Investor needs to find a reputable construction supervision unit, ready to best meet the supervision work.
CONSTRUCTION SUPERVISION FOR QUALITY AND CONSCIOUS STEEL CONSTRUCTION IN HAI PHONG
The monitoring process plays a very important role to ensure that the project is comprehensively supervised, helping to ensure the quality of the construction, bringing high economic efficiency to the investor. SVG's engineers with qualifications and practical experience will conduct monitoring of the quantity, cost and quality of materials. We supervise the construction progress by stage, item, and whole project to ensure the project is done on schedule. We build a professional construction supervision pre-engineered steel process with all necessary steps. We have successfully implemented many construction supervision contracts in Hai Phong as well as in other provinces in the country.
Construction supervision for quality and dedicated pre-engineered steel buildings in Hai Phong
Construction supervision for quality and dedicated pre-engineered steel buildings in Hai Phong
Based on detailed drawings from the design stage, the steel structure will be manufactured. The production process at the factory is very important because this is the stage that will determine the accuracy in erection and sustainability of pre-engineered steel works.
CONSTRUCTION SUPERVISION PROCESS FOR PRE-ENGINEERED STEEL WORKS
The construction supervision process of pre-engineered steel buildings is an important factor to ensure the quality of the work to achieve the set goals and performance, in order to meet the investment requirements from the investor. We have qualified supervision to ensure that the construction project is completed on schedule, with the highest quality and maximum level. At the same time, keep track of the technical requirements as well as the approved method design.
Construction supervision for quality and dedicated pre-engineered steel buildings in Hai Phong
Construction supervision for quality and dedicated pre-engineered steel buildings in Hai Phong
The investor needs to understand the factors that the supervisory engineer team needs to strictly ensure in this process, including:
SVG is responsible for and monitors and controls the volume of the entire project.
Ensure the construction progress and time are the same as the signed contract;
SVG is responsible for labor safety and construction works at the site;
CONTACT INFORMATION:
SAO VIET DESIGN CONSULTING AND CONSTRUCTION SUPERVISORY JOINT STOCK COMPANY
Hai Phong Office:
SVG Building - Bui Vien Street - Le Chan District - Hai Phong City
Tel: (0225) 3.747.819
Website: giamsatcongtrinh.com & en.giamsatcongtrinh.com
Hotline: 0902.593.686 - 0936.547.819
Email: svg.group2005@gmail.com & svg.engineer@gmail.com
Branch office:
1, Ha Noi Branch Office: No. 9, Alley 81 Hoang Cau Street, Dong Da District, Hanoi Capital
2, Ho Chi Minh Branch Office: 2/1C Cao Thang Street, 05 Ward, 3 District, Ho Chi Minh City